Utilizziamo i cookie per personalizzare i contenuti e gli annunci, fornire le funzioni dei social media e analizzare il nostro traffico. Visualizza dettagli…
Doornpark, 10, Beveren, 9120, Belgium
Orario
LU 09:00 – 17:00 SA chiuso
MA 09:00 – 17:00 DO chiuso
ME 09:00 – 17:00
GI 09:00 – 17:00
VE 09:00 – 17:00
Chi Stabirail
Stabirail developed a ground-breaking method for laying slab. Because our new system for “bottom up”-construction of ballastless track offers previously unseen advantages, it is taking the world of railway or railroad construction by surprise. Stabirail designed and developed a unique method for milling concrete blocks so the rails can be assembled directly and accurately on the concrete beds.
Descrizione
Stabirail’s new ballastless track or slab track construction system has proven to be the most efficient method for laying railway tracks in concrete beds.
Ballastless or Slab track construction
Superior stability, the absence of deformation and a shallower construction height are just some of the advantages slab track, also known as ballastless track, offers compared to its traditional counterparts.

Stabirail has designed and developed a new method for ballastless track or slab track construction in tunnels and railway stations. Our ground-breaking system has proven to be the most efficient method for laying ballastless railway tracks in concrete beds. Furthermore our new slab track or ballastless track construction method guarantees higher accuracy, longer design life and lower whole-life cost.
Fondazione
1994
Prodotti
Ballastless tracks, slab tracks

Business in Beveren, Belgio

Servizi e forniture edili 1 Azienda per forniture ferroviarie 1

I luoghi simili nelle vicinanze